MPS Planner โ€” Whole Bird Weight Grades

master plan by line ยท 5 days โ†’ 12 weeks โ†’ months ยท SAP MRP handoff

โ€“
Demand fill (6 mo)
โ€“
Shortage (birds)
โ€“
Peak bucket load
โ€“
Line 1 utilisation
โ€“
Line 2 utilisation
โ€“
Planned tonnage

Master production schedule โ€” one row per line, total birds per bucket (editable; Suggest fills it, you own it)

Capacity per line: 125,000/day ยท weekly ร—5 working days ยท monthly ร—22
PLANNED OUTPUT MIX โ†’
The mix converts each line-bucket total into weight grades for the balance below โ€” set it from your grading history. Sum 100%.

Projected available balance by grade โ€” stock + cumulative supply โˆ’ cumulative demand

Balance: covered shortage building ahead / surplus no demand

Demand โ€” orders + forecast, birds per grade per bucket (editable โ€” type your real numbers)

Seeded with a seasonal uplift in the final months โ€” hit Suggest and watch the weekly buckets build ahead to cover it.

Demo-grade planning model: MPS by line over telescoping buckets (5 daily ยท 12 weekly ยท monthly to 6 months), lot-for-lot suggestion with build-ahead capacity smoothing, single planned grade mix. Production build adds per-bucket mixes, lot sizing, safety stock, freezer aging and firm/time-fence zones. An EvoApps demo by Oaksoft / EvoEdge.